Repair Clamp Installation

Client: Rever Offshore

End Client: EnQuest

Asset: Thistle Platform

Project: Jacket Brace Repair Clamp Installation

Scope: Installation method development and technical animation for HIRA and project communication

Project Overview

While providing project engineering services to Rever Offshore, Elgenio developed a technical animation to communicate the proposed installation sequence for a jacket brace repair clamp on the Thistle Platform.

The animation was developed as a practical engineering communication tool, allowing the project team and client representatives to review the proposed method visually before offshore execution.

The Challenge

Installation of the repair clamp involved a number of sequential offshore activities around an existing jacket brace, with equipment positioning, access and installation interfaces needing to be clearly understood by the wider project team.

Conventional drawings and written procedures could describe the individual activities, but were less effective at communicating the complete sequence and the interaction between the clamp, existing structure and installation equipment.

A clear visual overview was therefore required to support review of the proposed method during the project HIRA.

Engineering Scope

  • Installation Method Development
  • Installation Sequence Review
  • 3D Equipment & Structural Visualisation
  • Technical Animation
  • HIRA Support Material
  • Project Communication

The Solution

The proposed installation method was converted into a technical animation showing the principal stages of the repair clamp installation and the relationship between the clamp, installation equipment and existing jacket structure.

The visual sequence provided a common reference for the engineering, offshore and client teams and allowed the complete method to be reviewed without relying solely on individual drawings or written procedure steps.

The animation was incorporated into the project HIRA to support discussion of the planned activities, interfaces and installation sequence.

Results

Clear Method Communication

The animation provided a simple visual overview of the proposed offshore installation sequence and project interfaces.

HIRA Support

The visualisation was used during the project HIRA to support review and discussion of the planned work.

Positive Client Feedback

The visual approach was well received and provided an effective common reference for the project and client teams.

Need a clearer way to communicate a complex offshore installation?

Elgenio can develop engineering-led technical animations to support method development, HIRA workshops, project reviews and offshore briefings.