6″ Flexible Replacement

Client: Boskalis Subsea

Project: Repsol Claymore 6" Flexible Replacement

Scope: Installation analysis, tie-in spool lift checks, rigging design and dropped object assessment

Vessel: Boka Atlantis

Project Overview

Elgenio provided onshore engineering support for replacement of a 6", approximately 750 m gas import flexible flowline between the Claymore Platform and the Gas Import ESD Valve Skid.

The scope included OrcaFlex installation analysis for initiation, lay and laydown, structural and rigging checks for the tie-in spool lift, and dropped object assessment for the offshore installation campaign.

The Challenge

The installation required several distinct offshore operations to be developed around the vessel configuration, flexible product behaviour, subsea interfaces and lifting requirements.

Installation loads and geometry had to be assessed through the different phases of the operation, while the associated tie-in spool lift required structural verification and a suitable rigging arrangement.

The scope also required assessment of dropped object risk to understand the potential interaction between dropped items and existing subsea infrastructure.

Engineering Scope

  • OrcaFlex Initiation Analysis
  • Flexible Lay Analysis
  • Laydown Analysis
  • Tie-In Spool Structural Checks
  • Rigging Design
  • Lift Load Definition
  • Dropped Object Analysis
  • Drop Cone Hit Probability Assessment

The Solution

Elgenio developed the installation analysis in OrcaFlex to assess the behaviour and governing loads of the flexible flowline during initiation, lay and laydown.

The analysis results were used to support development of the offshore installation method and confirm the loading requirements for the selected vessel and equipment.

Structural checks and rigging design were completed for the tie-in spool lift, providing a practical lifting arrangement for offshore handling and installation.

A dropped object assessment was also undertaken in accordance with DNVGL-RP-F107, including drop cone hit probability assessment for relevant subsea infrastructure.

Results

Defined Installation Loads

OrcaFlex analysis established the governing loads and behaviour through initiation, lay and laydown.

Verified Lift Arrangement

Structural checks and rigging design supported safe offshore handling of the tie-in spool.

Subsea Risk Assessment

Dropped object assessment quantified potential interaction with existing subsea infrastructure during the campaign.

 

Need engineering support for a flexible or subsea installation campaign?

Elgenio can support installation analysis, lift engineering, dropped object assessment and offshore project execution from planning through delivery.