6″ Flexible Replacement

 

Client: Boskalis Subsea

Project: Repsol Claymore 6" Flexible Replacement

Description: Onshore engineering for the installation of the 6″ 750m Gas Import flexible flowline  between the Claymore platform and Gas Import ESD Valve Skid using the Boka Atlantis DSV.

Services provided as part of this scope:

  • Orcaflex installation analysis for initiation, lay and lay down
  • Tie in spool lift structural checks and rigging design
  • Dropped object analysis including drop cone hit probability in accordance with DNVGL-RP-F107.