Client: Maersk Supply Services
Project: MSS Dunlin Alpha Conductor Guide Decommissioning FEED
A FEED study into the removal of the 200Te & 400Te Dunlin Alpha conductor guide frames and conductor as part of the Dunlin Alpha decommissioning program.
Services provided as part of this scope:
- Weight Take off lifted components
- Structural Analysis of the CGF frames during cutting
- Structural Analysis of the CGF frames for lifting
- CGF Rigging Specification
- Conductor free standing check
- Shear Pin for Conductor Lift Check