Client: Maersk Supply Services
Project: Perenco WHPS Structure Decommissioning
Brief Project Description: Elgenio provided onshore and offshore engineering for the decommissioning of Perenco’s 3 x 100Te + Well Head Protection Structures from the seabed to the deck of the CSV Maersk Installer using the vessel main crane.
Services provided as part of this scope:
- Orcaflex recovery analysis.
- Seafastening design including bespoke grillage design.
- Weight Take offs inc affects of MG and trapped water.
- Rigging design.
- Pile pull out load estimation.
- Offshore project engineering.